Completed in 2019, CAS added ten operating room suites to the 3rd floor of the existing hospital. The project scope included HVAC, plumbing and mechanical piping with a value of over $10 million.
Completed in 2022, CAS installed water source heat pumps using prefabricated piping in two (4 and 5 story) buildings on campus in Winston-Salem.
Scheduled to Complete in 2023 this CAS project scope includes HVAC, Mechanical Piping, Plumbing, and Boilers.
©2023 Commercial Air Systems, Inc. - A TriplePoint Company